To ensure proper bonding and penetration in pavement construction works, it is recommended for:

  • Prime coat application on granular road bases before asphalt laying.
  • Seal coat works to improve surface adhesion and durability.
  • Surface dressing and patch repair works.
  • Spraying applications in cooler weather conditions.
  • Temporary dust control and binding of loose mineral particles.
  • Store in tightly closed containers in a cool, well-ventilated area.
  • Keep away from heat, open flames and sources of ignition.
  • Protect from direct sunlight and excessive temperature.
  • Avoid contact with water and moisture contamination.
  • Follow all safety regulations for storage of flammable materials.
  • Good penetration properties
  • Improved adhesion
  • Suitable for cooler weather application

Tools: Clean with Kerosene.
Hand: Use a hand cleanser or kerosene followed by soap and water.

Bitumen Cutback Is used for a wide range of application Where the temperatures are too cool for an effective priming, or where traffic is likely to upset a primed surface before the final seal sprayed, a primer seal can be used to give adequate protection of the pavement for periods up to 6 ~ 12 months.

Steel drums (palletized) Bulk tankers.

Cutback bitumen’s suitable for priming are also used for seal coats, which is applied to an underlying surface to help with adhesion of subsequent asphalt layer. A typical rate of application between 0.2 to 0.4 litres/sq. m.

  • Cutback bitumen’s suitable for primer sealing can also be used in the manufacture of Pre- mix asphalt, which is used in patch repairs.
  • Sprayed sealing: Cutback bitumen’s are used extensively in spray sealing applications, particularly in cooler weather where they improved initial stone retention due to their low viscosity.
  • Always wear suitable personal equipment (PPE). Full skin protection is required to avoid accidental burns when transferring or handling bitumen.
  • Always prevent contact between water and hot bitumen by checking the contents of the previous load before loading bituminous products into bulk tankers and by strictly follow the procedures to avoid frothing and boil over of tanks.
  • Avoid exposure to fumes by standing back on the gantry or up wing until the vapours have dispersed.
  • Minimise bitumen fumes by heating bitumen and asphalt products to the recommended temperatures.
  • Minimise the use of diesel when cleaning equipment as this contributes to the bitumen fume. Cutbacks are sometimes used at a temperature above their flash point, so care must be taken regarding the products’ flammability. Ensure personnel are well trained in the correct handling & safety procedures.

International Insulation Company (IIC) – Bitugulf technical support team consist of expert engineers offers a comprehensive service support to specifiers, end users and contractors, and on-site technical assistance.

Note: The technical data provided reflects typical properties based on laboratory tests and practical experience, subject to UEAtc tolerance levels. While we cannot guarantee performance under all conditions, further details are available upon request, with a standard variation of up to 20%.